Volunteers with the loco in 2016
First boiler tube pulled from the loco
GSN at Sellindge in 2016
The spare plain axle thats being coverted into a crank
Nameplates after casting
Volunteers at the Sellindge in 2017
An almost complete reverser purchased for the loco
Trailing truck spring beam being cut in 2017
Newly completed axle box covers in 2017
2018 AGM at Yeovil Steam Centre
Klinger valves being machined in 2018
Volunteers posing with GSN after the last working day at Sellindge
GSN on a low loader arriving into Blunsdon.
Completed Klinger valves
Members posing at the 2019 AGM
Remembrance Sunday 2019
Trailing truck components being test fitted
Front end cladding under construction
Rear mounts get some heat in preparation for the boiler lift
Removing the rebuilt style reverser
Last photo prior to boiler lift
The boiler lift in process
The removed trailing truck
© GSNLRS 2016 - 2023, All Rights Reserved.
Member of the Heritage Railway Association,
Bulleid Pacific Locomotive Associationand Mainline Steam Builders Group
Patron: Dr. Alice Bunn OBE (FIMechE FRAeS CEng)