Below is the current available information we have to date on 21c11 / 35011 works visits, should you have any additional information please Contact Us here to update our archive.
All works visits were to Eastleigh
Notes:
1) The Southern Railway used an A to D alpha designation for works visits / exams with A being major to D minor.
2) British Railways used the following:
NC – Non Classified
LI – Light Intermediate
HI – Heavy Intermediate
LC – Light Casual
HC – Heavy Casual
GO – General Overhaul
3) Occasionally visits were reclassified during the visit e.g. LI- GO
4) Mileages recorded under British Railways were from last General Overall
Works Date Type Mileage Works carried out
09/02/1945 - 10/02/1945 D
24/03/1945 - 12/05/1945 C 8,673
29/03/1945 - 12/10/1945 C 27,733
18/11/1946 - 11/01/1947 A 84,768 Repainted Malachite, standard smoke deflectors.
03/01/1948 - 27/01?1948 C 58,178
29/09/1948 - 06/11/1948 A 84,650 Renumbered, Malachite Green, yellow lines, BR Gills Sans numerals and lettering.
07/09/1949 – 07/10/1949 HI 48,222
01/08/1950 – 29/09/1950 HC 83,460 552 monel metal stays renewed, new steel firebox, new top
½ syphons, 124 new “Howel” tubes, 40 new superheater tubes. Modified cab.
12/10/1951 – 17/11/1951 LI 132,986 400 steel stays repaired, lead plugs, 30 new “Howell” tubes, repainted BR Green.
17/04/1953 – 16/05/1953 LI 203,241 456 steel stays repaired, slight pit holes on tubeplate welded, lead plugs renewed and holes welded, 15 new “Howell” tubes, 2 new superheater tubes, sliding covers for whistle and manifold valves removed and front casing removed.
05/01/1954 – 23/01/1954 LC 231,085 Modification No.89, Test 2133 (to castings of 3 inch Ross safety valves), Test 2204 (to LMR Steam heating valve).
14/05/1954 – 05/06/1954 LC 239,460 Two modifications, boiler pressure reduced to 250psi.
02/07/1954 – 09/07/1954 LC 242,138 Was a “Return” an adjustment to previous work.
25/01/1955 – 19/02/1955 HI 267,520 Eleven modifications, three tests, 280 steel stays repaired, lead plugs, 16 new “Stewart & Lloyd” tubes, 2 new superheater tubes.
Balanced crank axle to Drg. W.11247.
New steel axleboxes and manganese liners
Fitted with fabricated trailing truck ex 35021
16/02/1956 – 29/03/1956 GO 320,422 Twelve modifications, two tests, plain coupling rods, TIA recorder removed and connections plugged off.
19/09/1956 – 05/10/1956 NC-LC 31,394
19/06/1957 – 03/08/1957 LI 68,076 Four modifications, two tests, Tender modified.
09/10/1958 – 25/10/1958 LC 154,086
05/12/1958 – 13/12/1958 LC 159,051
07/05/1959 – 04/07/1959 GO 180,943 REBUILT, eleven modifications, four tests, Renewals of PV Spindle pockets, ashpan watering pipes, anti-glare shield, regulator shroud, CI valve seat, 42 monel metal and 350 steel stays, 6 fusible plugs, 2 diaphragm neck patches, 124 new “Stewart & Lloyd” tubes, 40 second hand superheater tubes. 2nd BR Tender emblem.
20/04/1961 – 20/05/1961 LI-HI 120,574 AWS and Speedometer fitted, 400 stays rivetted over, mudhole seating fitted, 22 new “Stewart & Lloyd” tubes
17/10/1962 – 01/12/1962 LI 218,574 720 steel stays rivetted over, 6 fusible plugs, syphons right and bottom patches fitted, 25 new “Stewart & Lloyd” tubes,6 new superheater tubes.
13/06/1963 – 29/06/1963 NC-LC 248,839 Spark arrestor fitted, 655 steel stays rivetted over, 6 fusible plugs, 21 second hand welded superheater tubes.
20/02/1964 – 21/03/1964 LC
02/02/1965 – 19/03/1965 LC 150 steel stays rivetted over, 6 fusible plugs, 88 new “Stewart & Lloyd” tubes, 15 new and 16 second hand welded superheater tubes.
Feb 1966 - Withdrawn
Summer 1966 - Centre crank axle replace with a plain axle (crank axle fitted to 35026 at Weymouth)
© GSNLRS 2016 - 2023, All Rights Reserved.
Member of the Heritage Railway Association,
Bulleid Pacific Locomotive Association
and Mainline Steam Builders Group
Patron: Dr. Alice Bunn OBE (FIMechE FRAeS CEng)